web statistics

Vacuum Cleaning Furnace

Maximum temperature is set at 490˚C, running time 8 hours; after 90minutes heating, vacuum pump starts.
In order to improve the cleaning effect and increase the life time of work pieces,after taking out of vacuum cleaning furnace, the subsequent process should be carried out, but depending on specific conditions.

1. Put spinnerets, candle filters or other elements into hot water tank to rinse for about 20 minutes.

2. Then carry these work pieces into ultrasonic cleaning unit for about 30 minutes, ultrasonic frequency 25 ~ 40kHz.

3. After rinsing inside ultrasonic cleaning unit, dry it by compressed air before examination under microscope

4. In case of silicone oil adhering to the surface of work pieces, before ultrasonic treatment, put it inside the liquid of KOH solution, at concentration 20%, temperature 60 ~ 70˚C for about 2hours, then neutralization treatment with oxalic acid.

Hereafter some dimension is listed. We provide any dimension as requested.

Model
Hearth Dimension (LxWxH)
Heating/Vacuum Pump KW
Vacuum level MPa
Designing Temperature ˚C
Precision ±˚C
LZKL Furnace
LZKL-A
Φ500×600
18/2.2
-0.07 ~ -0.085
600
2
LZKL-B
Φ600×800
21/2.2
-0.07 ~ -0.085
600
2
LZKL-C
Φ800×1000
30/4
-0.07 ~ -0.085
600
2
LZKL-D
Φ1000×1200
36/4
-0.07 ~ -0.085
600
2
WZKL Furnace
WZKL-A
Φ500×600
18/2.2
-0.07 ~ -0.085
600
2
WZKL-B
Φ600×900
21/2.2
-0.07 ~ -0.085
600
2
WZKL-C
Φ800×1000
30/4
-0.07 ~ -0.085
600
2
WZKL-D
Φ1000×1500
36/4
-0.07 ~ -0.085
600
2
WZKL-E
Φ1700×4800
234/18.5
-0.07 ~ -0.085
600
2
JZKL Furnace
JZKL-A
600×400×400
18/2.2
-0.07 ~ -0.085
600
2
JZKL-B
600×400×400
21/2.2
-0.07 ~ -0.085
600
2
JZKL-C
1000×800×600
30/4
-0.07 ~ -0.085
600
2
JZKL-D
1200×800×800
36/4
-0.07 ~ -0.085
0.45
2
Side 2 of 2      1 - 2